
Thunder Bay – Ruttan Street ..Turd Polishing?
I think that our Engineering Department plans on paving over top of this. The contractor milled off about 50 mm or two inches of the old asphalt. That left a pretty beat up and severely crack riddled surface. I will have to keep an eye on this project. All those cracks will eventually reflect through […]